Solution Control

The foundation of metal finishing quality

When chemical concentrations, temperature, and pH are controlled, plating performance is predictable and coating properties are consistent.

Automatic Calculations

Auto-calculate results, adds, and decants.

Log of results, additions, lot numbers, and notes.

Up to 16 tests per tank and three adds per test.

Customizable methods, targets, and analysis.

Quick and easy setup with the ChemTrak Library.

Automatic calculation of test results, adds, and decants

iPad or Android tablets

A key to the Paperless Shop

Enter adds, pH, temp, TDS on the go.

Auto-calculate results, adds, and decants.

Eliminate printed add sheets - save paper & time.

Enter additions, temp, and pH on the tank line

Tank status on monitors

A key to the Paperless Shop

See tank status per AC7108 Section 4.8.7 rules.

Designed for wall-mounted monitors or TVs.

Yellow lights show pending additions.

Works with JobTrak to eliminate paper.

Sync lab and line

Statistical Analysis

Audit-Ready Statistical Process Control (SPC)

Time domain, distribution and control charts

Cpk, μ, and 3-σ control limits shown

Charts are scrollable to show history

Scrollable Histogram shows µ, 3σ control limits, Cpk

Nadcap Accreditation

Periodic testing helps with PRI audits.

Trend results and log your material certs.

Run your jobs on time.

Demonstrate use of Invalid, Retest, and Replace.

Trend results and log your material certs

More money to your bottom line.

No upfront cost. Free trial with no obligation.

No per-user fees or other hidden costs.

FREE online training.